QUALITY CONTROL TEST
The main test equipment which include as below: headlamp testing, aging test bench, light distribution performance test , salt spray tester, etc.
Aging test bench
Photometric Performance Testing System for Luminaires
Headlamp tester
Salt spray tester
ASSEMBLY WORKSHOP
The assembly workshop has 4 lines, 1 packaging line, 26 flexible assembly units and 1 wire harness assembly line, and the capacity is around 35,000 units per day. The time of market orders is 7-10 days, and the lead time of OEM orders is 12-15 days.
SAMPLE DISPLAY
MOULD DESIGN
PRODUCT DESIGN
R&D TECHNOLOGY
We have various technicians in R&D for the lamps, from product appearance design, joint design, Circuit design, injection mold design to hardware mould design. The lead time for the new prototype products can be shorten to 3-5 days and the new moulded products will be delivered within 35 days.
WORKSHOP LAYOUT
HARNESS ASSEMBLY AREA
FLEXIBLE ELEMENT
ASSEMBLY LINE BODY
ACCESSORIES WORKSHOP
The accessory workshop has 14 injection molding machines, 26 stamping equipment and 9 machining equipment, which can meet the processing requirements of the main injection moldin, At the same time, it supports the processing and assembly of newly opened internal injection molding and hardware mold parts.
INJECTION MOLDING AREA
DISC VERTICAL INJECTION
MOLDING MACHINE
HARDWARE AREA
MACHINING AREA